Rehabilitation of the Venoge River between Eclépens and Lussery-Villars at Bois-
de-Vaux, river deviation and creation of new a meander.
Rehabilitation of the Venoge River (Eclépens-Lussery, Switzerland, 2005-2013, Canton Vaud)
Rehabilitation of the Asse River (Chéserex, Switzerland, 2007, Canton Vaud)
Rehabilitation of the Asse River through the private domain of Bertarelli-Späth,
creation of chutes and rest areas for fish.
Rehabilitation of the Coruz River (Poliez-Pittet, Switzerland, 2010-2012, Canton Vaud)
Rehabilitation of the Broye River (Moudon-Payerne, 2010-2014, Cantons Vaud/Fribourg)
Rehabilitation and lengthening of the Coruz River over more than 150 m,
creation of chutes, river widenings and inundated areas, as well as a fish pass
through the chutes and inside the flow deviation gallery.
Diagnostic of the potential for river rehabilitation of the Broye River between
Moudon and the Lake of Morat. Rehabilitation of the Broye River at some of its
tributaries (Bioleyre, Vaux, Cerjaule, Trey).
Fish pass at Bressonnaz on the Broye River (Moudon, 2005-2006, Canton Vaud)
Design and supervision of construction works of a fish pass on the Broye River.
Fish pass at Lucens on the Broye River (Lucens, 2011, Canton Vaud)
Design and supervision of construction works of a fish pass on the Ruisseau des
Vaux, tributary of the Broye River.
Fish pass at Fétigny on the Broye River (Fétigny, 2011-2012, Canton Vaud)
Design and supervision of construction works of a fish pass on the Bioleyre River,
tributary of the Broye River.
Fish pass at Lucens on the Broye River (Lucens, 2012, Canton Vaud)
Design and follow-up of construction works of a fish pass on the Cerjaule River,
tributary of the Broye River.
Fish pass on the Trey River (2012, Canton Vaud)
Design and follow-up of construction works of a fish pass on the Trey River,
tributary of the Broye River.
Fish pass on the Talent River at Cugy (2012-2013, Canton Vaud)
Design and supervision during works of fish pass on the Talent River near Cugy.
Fish pass on the Talent River at Morrens (2012-2013, Canton Vaud)
Design and supervision during works of fish pass on the Talent River near
Morrens.
Fish pass on the Venoge River at Cossonay (2012-2013, Canton Vaud and Sol-E Suisse)
Design of flow separation structure and rehabilitation of the Morvaz River.
Rehabilitation of the Morvaz River (2012, Canton Vaud)
Design and supervision of construction works of a fish pass on the Venoge River
at the Grand-Moulins Dam.