Design Study of Scour Potential at Ostour Dam in Iran.  
Ostour Dam Scour Study (2002, Iran)
Smith Mountain Dam Erosion Study (2003, Virginia, US Corps of Engineers)
Scour Potential downstream of dam crest and dam abutments.  
Scour potential at stilling basin of Folsom Dam (2003, Sacramento, USA, US Corps of Engineers)
Bottom outlet scour potential at Karahnjukar Dam (2005, Iceland, Landsvirkjun)
Scour potential in case of failure of concrete lining of stilling basin. Risk for dam foundations.  
Scour potential just downstream of the bottom outlet of Karahnjukar Dam, influence on the stability of the canyon.  
Landslide erosion study at La Plaine on the Rhône River (2005, Geneva, Canton Geneva)
Study of influence of flow on landslide formation.   
Spillway chute erosion study at Karahnjukar Dam (2005, Iceland, Landsvirkjun)
Scour potential in canyon due to jets from spillway structure.  
Erosion potential at bridge piers of RC177 Highway (2008, Vufflens, Service des Routes)
Study of the erosion potential of the Venoge River at the base of the future bridge piers of the RC177 highway.  
Design of new concrete lining at Gebidem Dam (2007, Wallis, Switzerland, Hydro Exploitation)
Design of new concrete lining downstream of Gebidem Dam, computations of ultimate scour following failure of the lining.  
Scour Potential at Koman Dam (2009, Albania, World Bank)
Study of scour potential in the plunge pool downstream of Koman Dam, influence of return currents on erosion damage at the tail of the dam.  
Scour Potential at Kariba Dam (2010-2012, Zambia-Zimbabwe, Zambezi River Authority)
Hybrid numerical-physical model study of scour potential downstream of Kariba Dam, proposal of scour mitigation measures.   
Scour Potential at Choranche Dam (2010-2011, France, EDF)
Scour computations in the pool downstream of the dam, influence of changing PMF event on ultimate scour formation.  
Scour Potential at Laouzas Dam (2012-2014, France, EDF)
Study of scour potential in the unlined stilling basin and downstream of the penstocks.  
Bluestone Dam Scour Study (2008-2010, Huntington, US Corps of Engineers)
Scour computations in the pool downstream of the dam, influence of rock anchors on scour formation.  